NO 765 LINE — PHOTOS & GRAPHICS FOR PRESS USE
No 765 Line, Inc. · no765line.org · press@no765line.org

All files below are campaign-owned. Free to reproduce in coverage with the
credit line given. Please caption them for what they actually show — see the
notes; a photo that doesn't match its caption is worse than no photo.

1. beci-study-area-annotated.jpg  (2046 x 1212)
   The developer's published BECI study area, annotated by No 765 Line with
   town labels, a corridor-width comparison, and the text of Wisconsin's
   siting-priority statute.
   CREDIT: "Map: No 765 Line, annotated from Midcontinent Grid Solutions'
   published study-area map (mgs-projects.com/BECI)."
   NOTE: this is the developer's STUDY AREA, not a route. No route has been
   filed. The 78 preliminary study segments sit inside this area and are
   available as open data at no765line.org/press-kit/.

2. existing-wood-pole-line-eisele-ridge.jpg  (1536 x 2048)
   An EXISTING wooden-pole transmission line on a Driftless ridge in Wisconsin,
   photographed at a landowner field day in June 2026.
   CREDIT: "Photo: No 765 Line."
   NOTE: this shows a line that is ALREADY THERE (roughly 70 feet). It is not
   a 765 kV structure and must not be captioned as one. The proposed towers
   would be roughly 180-200 feet.

3. no765-yard-sign-driftless-pasture.jpg  (1536 x 2048)
   A campaign yard sign in a Driftless pasture.
   CREDIT: "Photo: No 765 Line."

NO PEOPLE APPEAR IN THESE FILES. Photographs of speakers, landowners, and
crowds exist but are not distributed here; we ask people individually before
releasing images they appear in. If you need people for a story, email
press@no765line.org and we'll arrange it with their consent.

MORE
  Route data (GeoJSON + Google Earth KMZ) and press releases:
  no765line.org/press-kit/
