Comment on Wisconsin’s draft energy plan

No 765 Line, Inc. · A Wisconsin 501(c)(3) · Sourced. Coordinated.
Wisconsin PSC · MariBell fall 2026 · BECI early 2027

Take Action › Comment on the energy plan

PSC comments open through September 28, 2026

Comment on Wisconsin’s draft energy plan by September 28

The Public Service Commission is taking comments on the state’s draft 2026–2032 Strategic Energy Assessment in docket 5-ES-113 until Monday, September 28. The draft projects peak demand up more than 40 percent by 2032, lists BECI among the transmission it expects, and puts Wisconsin providers’ first-year share of the Tranche 2.1 cost at about $379 million. A comment here asks the Commission to show the assumptions, the alternatives and the risk before the plan is final.

Open the official PSC form →

Comment deadline
Monday, September 28, 2026
Docket 5-ES-113. The form is plain text; name, city, and state are required. Your comment becomes a public record.

The draft lists BECI before any permit application exists

The SEA is a statewide planning report and grants no permit for either proposed 765 kV project. Even so, the draft identifies BECI as anticipated infrastructure (report pp. 78 to 79) while BECI’s permit application, routes, need case, alternatives and final cost are all still undecided.

The draft SEA’s projected increase in Wisconsin peak demand Peak demand is shown rising from 14.2 gigawatts in 2026 to more than 20 gigawatts in 2032, a nearly 5.8 gigawatt increase. Three data-center developments account for 4.17 gigawatts, over 72 percent of the projected increase. PROJECTED WISCONSIN PEAK DEMAND 14.2 GW 20+ GW 2026 2032 forecast + nearly 5.8 GW 4.17 GW of the increase tied to three data centers
14.2 GW2026 peak
20+ GW2032 forecast
72%+of the projected increase tied to three data-center developments
Source · PSC of Wisconsin, Draft Strategic Energy Assessment 2026–2032, docket 5-ES-113, report pp. 2 and 10. These figures are forecasts from the utilities’ filings. The 72 percent is a share of the projected increase.

The same draft carries a preliminary staff estimate that Wisconsin electric providers could pay about $379.29 million in the first year of service for the Tranche 2.1 projects, at 2024 rates, if the projects are approved for siting in each state (report p. 79). Wisconsin’s share would be 14.16 percent of what MISO collects for those projects each year. The final report should show the assumptions behind that estimate and a range of customer impacts.

Source · PSC Draft Strategic Energy Assessment 2026–2032, PSC REF# 595734, report pp. 78–79

Five prompts to choose from

Choose one or two. Add what you know from your own bill, farm, business or town plan, in your own words: the PSC’s comment form states that prepared material not written by the person commenting is not treated as a public comment.

Which loads are firm

Which very large loads are only proposed, permitted, under construction, contractually committed, or operating?

Who pays if a data center is delayed or canceled

If a forecasted data center is delayed, downsized, or canceled, who is responsible for infrastructure built around it?

Alternatives on equal footing

How do efficiency, demand response, storage, local resources, advanced reconductoring, dynamic line ratings, power-flow controls, and existing corridors compare on the same reliability assumptions?

The place a statewide plan cannot see

Describe the farm, well, karst, stream, business, emergency service, habitat, or community plan a future project-specific review must examine.

The evidence that would change the plan

Request public decision triggers, sensitivity cases, and a clear distinction between anticipated and approved projects.

The U.S. Department of Energy’s 2023 advanced-conductor report finds that reconductoring adds capacity inside an existing right-of-way, and that whether it fits depends on the line. Ask for the engineering, cost and timing for each specific constraint, in the record.

About five to ten minutes

How to file

  1. Draft it somewhere that keeps a copy. A note, document, or email draft protects your work if the form times out.
  2. Open the PSC’s official form for docket 5-ES-113. Go directly to the form.
  3. Give the required public information. Name, city, and state are required. Share only what you are comfortable putting in a public record.
  4. Paste your own words. Name the draft SEA and make one or two specific requests.
  5. Submit no later than Monday, September 28, and save the confirmation. You may forward the confirmation to info@no765line.org so we know you filed; you do not need to send us your comment.

Prefer mail? Address it to: Docket 5-ES-113 Comments, Public Service Commission of Wisconsin, P.O. Box 7854, Madison, WI 53707-7854. Allow time for delivery.

A starting draft to make your own

The starting draft

I live in [town], [county] County, and I am commenting on the draft Strategic Energy Assessment in docket 5-ES-113. The draft projects peak demand rising by more than 40 percent by 2032 and says over 72 percent of that projected increase is tied to three data-center developments. Please separate proposed, permitted, under-construction, contractually committed, and operating loads, and explain who pays if one is delayed or canceled. Before the plan counts on new 765 kV transmission, please compare efficiency, demand response, storage, local resources, advanced reconductoring, other grid-enhancing technologies, and existing corridors on the same reliability assumptions. Please label projects that have no permit as proposed. [Add two or three sentences about the place, bill, business, or community concern you know personally.]

The scope of this comment

  • This comment enters your view into the official record for the statewide draft energy plan.
  • It does not approve, deny, or select a route for BECI or MariBell.
  • It does not replace commenting or intervening in either future CPCN proceeding; MariBell and BECI are separate projects and will have separate permit records.
  • Send it through the official public form or the mailing address, never privately to individual commissioners.
The public-interest test

Ask the final SEA to keep three questions open until the evidence answers them: whether the infrastructure is needed, whether it is paid for fairly, and whether it is less harmful than the reasonable alternatives.