Walk the line — the proposed corridor

No 765 Line, Inc. · A Wisconsin 501(c)(3) · Sourced. Coordinated.
Wisconsin PSC permit case · expected fall 2026
The proposed corridor · interactive

Walk the line.

The developer’s map is a set of thin lines across 140 miles. Scroll to see the country they cross — the same cold-water streams and karst, nearly the whole way. The routes shown are the MariBell project’s primary and alternate routes — proposed and not yet finalized. The BECI continuation, running east and south to the Illinois line, still has no route — its developer, Midcontinent Grid Solutions, has published only a broad nine-county study area (shaded on the map) plus named connection points: Bell Center, the Columbia substation near Portage, the Sugar Creek substation near Elkhorn, and a state-line crossing in Rock County. The Hillsboro area, named in the developers’ January announcement, is not inside the published study area.

MariBell routes · primary & alternate, not finalized (Transource, 4/24/2026) · BECI · study area + connection points — no route filed (MGS, 7/2026)

Is your land near the route?

Map layers

Approximate, proposed route — for orientation only. Geocoding by OpenStreetMap/Nominatim. Need help? Landowner support →