Press & media kit

No 765 Line, Inc. · A Wisconsin 501(c)(3) · Sourced. Coordinated.
Wisconsin PSC permit case · expected fall 2026

News › Press & media kit

Press & media kit

For the press.

Everything you need to cover the proposed 765 kV line accurately — the facts with sources, how to describe the project precisely, our boilerplate, and contact. Quote any of it.

At a glance

765 kV

Two proposed high-voltage lines on 150–200-foot steel towers, crossing southern Wisconsin — including the Driftless region — as part of MISO’s Long-Range Transmission Plan (Tranche 2.1). Source · MISO LRTP; MariBell and BECI project descriptions

$1.80–3.50 vs. <40¢

MISO’s planning case claims $1.80–$3.50 of benefit per dollar spent; MISO’s own Independent Market Monitor (Potomac Economics) estimates less than 40¢ per dollar. The benefit case is contested. Source · MISO LRTP benefit metrics; Potomac Economics (IMM)

Two filings

The line reaches the Wisconsin PSC as two segments on two clocks. A CPCN application for the western MariBell segment is expected in fall 2026; for the eastern BECI segment, the developer told Richland County officials it intends to file in February 2027. Each filing opens its own docket for public comment and intervention. Source · Wisconsin PSC CPCN process; MGS statements to Richland County officials, July 9, 2026

Flat demand

Wisconsin’s electricity demand has been essentially flat for two decades; by one measure 2024 retail sales were modestly lower than 2005. The growth cited for new transmission is concentrated elsewhere — and the corridors are not designed to deliver power to the communities they cross. Source · EIA-861 Wisconsin retail sales, 2005–2024

How to describe the project (precisely)

The lines are not “private” or “merchant” projects — they are part of MISO’s publicly planned, cost-allocated Long-Range Transmission Plan, and Wisconsin ratepayers help pay for them. What is accurate to say is that private companies profit: GridLiance Heartland (a subsidiary of NextEra Energy Transmission), Transource Energy (an AEP/Evergy partnership), and BHE Transmission (Berkshire Hathaway) are for-profit firms earning a regulated return on the build; Dairyland Power Cooperative, MariBell’s co-developer, is a member-owned co-op.

So: “publicly planned regional transmission projects that private, for-profit developers would profit from, paid for in part by Wisconsin ratepayers.” Accurate, and it survives scrutiny.

Source · MISO Long-Range Transmission Plan (Tranche 2.1); project filings; MISO cost allocation

Boilerplate

No 765 Line, Inc. is a Wisconsin 501(c)(3) nonprofit and a citizen coalition of neighbors across southern Wisconsin opposing the two proposed 765 kV transmission lines, MariBell and BECI. The organization works to build an accurate public record before the Wisconsin Public Service Commission and to support the landowners and communities along the proposed corridor.

Media contact

For interviews, statements, photos, or to verify a fact before you publish, reach Michael Browne, Media Lead, at press@no765line.org or 412-335-8295. We respond quickly to reporters on deadline. For regulatory and subject-matter questions we can also put you with Rob Danielson, a board member who intervened in the Badger-Coulee proceeding.

Route data — GeoJSON, shapefile & Google Earth

The developer’s 78 preliminary “study segments” for the proposed BECI line, its nine-county study area, and its five identified connection points — captured verbatim from the developer’s public project map and provided in open formats (GeoJSON, Esri shapefile, KMZ) so newsrooms and county GIS offices can map them directly. These are the developer’s preliminary study segments, not proposed or final routes; verify against the developer’s map before publication and note your own retrieval date.

Attribution requested: “Route data: developer’s public project map (mgs-projects.com/BECI), captured by No 765 Line.”

Source · mgs-projects.com/BECI (geometry captured August 2026, reproduced verbatim)

Logos & photos

Free to reproduce in coverage with the credit line included in each pack. Every file is campaign-owned; none are AI-generated. No people appear in the photo set — we ask individuals before releasing images they appear in, so if you need people for a story, email press@no765line.org and we will arrange it with their consent.