The window is now

Take action.

The Public Service Commission filing is expected in fall 2026. The record built before then shapes the decision. Here are ways to help.

A No 765 Line yard sign — reading OUR LOSS, THEIR GAIN, NO NEED with a transmission-tower graphic — planted in a green Driftless pasture, with existing power lines and a wooded bluff behind it.
Campaign yard sign · Driftless region
Put a sign in your yard

Every sign is a public “no.”

A yard sign does two things at once: it shows your neighbors where you stand, and it helps people find the campaign and the facts behind it. The more signs across the Driftless, the harder this project is to ignore.

A sign is a donation — and like every gift, it funds the work the PSC will weigh: sourced research, public-records requests, independent analysis. Two sizes: 24×18 for $20 or 36×24 for $30. It isn’t a giveaway; it’s the campaign made visible in your yard. After you give, we’ll match you to the nearest pickup point around the region.

Get a yard sign (from $20) →

Contact your lawmaker

Two minutes, and it counts: a note from a constituent in their own district carries far more weight than a form letter. We’ve done the whole thing for you.

1 · Find your two legislators

Enter your address at the state’s official lookup to get your State Senator and Assembly Representative, then copy one of their email addresses.

Find my legislators →

2 · Send them this email

It’s drafted below. Change anything you like, then open it in your email app and paste your legislator’s address into the “To:” line — or copy the text and send it your own way.

Subject: Please scrutinize the need and cost case for the proposed 765 kV line

Open in your email app →
Your message goes straight to your legislator — nothing routes through us. The Pfaff-Johnson “modern transmission” bill (SB 1125, 2025–26 session) did not pass; this asks lawmakers to champion that careful approach going forward. Lookup & bill: maps.legis.wisconsin.gov · docs.legis.wisconsin.gov.
Prefer to call? Here’s a 20-second script.
“Hi, my name is [name] and I live in [community]. I’m calling about the proposed 765 kV transmission line through the Driftless. I’m asking [legislator] to press for a careful, independent review of whether this line is actually needed, and to support a modern, responsible approach to transmission siting. Thank you.”

Show up. It’s the most persuasive thing you can do.

Hearings, board meetings, and campaign events are where this decision actually gets shaped — and where neighbors first hear what’s proposed. Our calendar tracks all three:

  • PSC & public hearings — the formal record. Attending, or filing a comment, is how regular people are heard.
  • County & township meetings — where local boards weigh in and resolutions happen.
  • Campaign & volunteer events — field days, tables at local events, and ways to pitch in.

See upcoming events →

Spread the word.

Most people in the region still haven’t heard about this project. The fastest way to change that is a neighbor who says “have you seen this?”

And a yard sign works around the clock — a public “no” that funds the case.